At Rawabi Electric, people knowledge and passion are put into action. Together, we can make the next milestone.
- 2012 - Official partner with Elatec of Germany to supply their fabulous portfolio featuring up to 7000 A, 63KA and 42.5 KV systems along with retrofitting services.
- World leading supplier of 15KV breaker type outdoor RMU (10,000 units) in association with Schneider Electric – France.
- Build, stage and IFAT 1st of its type mega high end redundant (local and remote) Power Automation solution (ENMCS: Electrical Network Monitoring and Control Systems) for YERP and Shaiba Projects, in association with SEL: Schweitzer Engineering Labs Inc. of USA.
- 2011 - Develop and Supply 1st of its kind pre-engineered, prefabricated Power and Control Center (34.5KV, 13.8KV, 4.16KV,480V, PLC, SCADA, Annunciator, UPS, HVAC &fire system.) to Saudi Aramco critical MPP.
- 2010 - 1st and only Facility in region to pass ATEX Certification, and Pass product type testing and certification with Kema Labs.
- Introducing IMS (ISO 9001 : 2008 and OHSAS 18001).
- Introducing IMS (ISO 9001 : 2008 and OHSAS 18001)
- 2009 - Production area increased to 17,500 m2
- Official Partnership with Canadian Dynamysk Automation to deliver high end process systems on MAC basis.
- 1st Petrochemical Process Control system completed on PMC basis, at Sipchem, Jubail.
- Induction of Eight stages Zink Phosphate Powder coating system
- 2008 - World leader in Switchracks, with over 1200 units delivered for both Classified and non Classified Areas
- Official partnership with European Cubic, to deliver their leading IEC and UL modular system solutions
- 2007 - Deliver the 1st Mega Process control (locally built, staged, and IFAT for the 1st time in Middle East), to Saudi Aramco Khurais Project, in association with Emerson Electric
- 2006 - 1st of its kind double redundant interlock system, for deferent power source
- 2005 - Classified Area Switchracks equipped with Fail-Safe MTS
- 2004 - Induction of High Precision CNC Metal Processing Machineries
- 2002 - 1st RTU solution is delivered, in association with Siemens and Bristol Babcock (Emerson Electric)
- 1st SCADA and ESD system delivered, in association with Yokogawa
- 2001 - 1st Passive Cooling Shelter for Telecom
- 2000 - 1st Portable Power Center delivered in association with Siemens
- 1998 - 1st ESD Triple Redundant System delivered to Saudi Aramco
- 1997 - 1st Sound Attenuated Generator Enclosure
- 1996 - 1st Walk-In Medium Voltage Switchgear Station
- 1995 - Rawabi is accredited for ISO 9002: 1994 by KEMA (Netherlands)
- 1994 - 1st delivery of Classified Area (NEMA7) Switchrack
- 1993 - Production area increased to 10,000 m2
- 1st Vibration and Temperature Monitoring System delivered to Saudi Aramco
- 1992 - Key SEC vendor for unit and packaged substations
- 1st Control Panel with Purging System delivered to Saudi Aramco
- 1st 10,000 Amps Synchronizing System
- 1989 - 1st Process Quality System established
- 1st Control system delivered
- 1988 - Production facility increased to 5000 m2
- 1985 - 1st Power system delivered SEC East, and Saudi Aramco
- 1984 - Company Established and construction work commence